Client: | Linden Homes |
Architect: | N/A |
Structural Engineer: | Alan Wood and Partners |
Quantity Surveyor: | N/A |
Principal Designer: | N/A |
Value: | £5.5 Million |
Category: | Civil Engineering |
Section 104 and 38 highway works and plot works to 145 no residential units, including surface water attenuation ponds, surface and foul water pumping stations and rising mains.
Off site Section 62 works including construction a new junction on the A1105 dual carriageway incorporating a central reserve crossing to provide access and egress for the development.