Client: | Bradford Metropolitan District Council |
Architect: | Bauman Lyons Architects |
Structural Engineer: | Adept Consulting Engineers |
Quantity Surveyor: | Unity Partnership |
Principal Designer: | Bradford Metropolitan District Council |
Value: | £2.6 million |
Category: | Education |
The vision was to transform the existing building into a sustainable performing building that could adapt to climate function changes in the future. The construction of three extensions now connects the existing block with classrooms on the first floor and a new administration area to the ground floor. The project also included extensive internal modifications and refurbishment to the existing school classrooms, toilets and administration area.